Scheme ID: 20097847 Name of Scheme: ISLAMABAD KALDA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1432 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Apr-2023 Actual Date of Completion (Capex): 25-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18m/102.15m ISLAMABAD KALDA 28.62555 77.532658
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBBLE 300LPM/55M ISLAMABAD KALDA 28.62555 77.532658
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT EXISTING OHT 100KL ISLAMABAD KALDA 28.62555 77.532658
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0860
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.051
2 HDPE 75 0.047
3 HDPE 90 0.161
4 HDPE 125 0.561
5 HDPE 140 0.716
HSC Connection
Sno. Total Nos.
Other Details
1.54
1.28
1.28
09-Nov-2024