Project Completion Certificate (Ground Water)
Scheme ID: 20097879 Name of Scheme: RAHALLAPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2360 Base Year: 2023 Intermediate Year: 2033 Design Year: 2058
Date of Completion (As per Contract): 13-Aug-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 22 M / 138.35 m RUHALLAPUR 25°.6773786 N 81.14475946"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 LPM / 60 M RUHALLAPUR 25°.6773786 N 81.14475946"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 14 M RUHALLAPUR 25°.6773786 N 81.14475946"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K,9 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 0.6045
2 HDPE 140 2.19
3 HDPE 110 0.4361
4 HDPE 90 0.5395
5 HDPE 75 0.8155
6 HDPE 63 3.8325
HSC Connection
Sno. Total Nos.
1 460
Other Details
2.55
0.00
2.55
29-Apr-2025
30-Apr-2025