Project Completion Certificate (Ground Water)
Scheme ID: 20097902 Name of Scheme: DURGU PUR SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1284 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 20-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12M/100m DURGU PUR 27.22554 79.44012
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 250LPM/61M DURGU PUR 27.22554 79.44012
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50KL/14M DURGU PUR 27.22554 79.44012
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0378
2 HDPE 63 2.354
3 HDPE 110 0.126
4 HDPE 140 0.062
HSC Connection
Sno. Total Nos.
1 264
Other Details
1.34
1.31
1.39
04-May-2024
05-May-2025