| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097905 | Name of Scheme: Saray Mohan Salempur | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2860 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 22-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 560 LPM | 21 / 129.33 | SARAY MOHAN SALEMPUR | 25.898232 | 81.004694 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 15 HP Submersible pump | 560 LPM / 60 | SARAY MOHAN SALEMPUR | 25.898232 | 81.004694 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 175 / 14 | SARAY MOHAN SALEMPUR | 25.898331 | 81.004520 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE, PN-6, PE-100 | 160 | .0561 | |
| 2 | HDPE PIPE, PN-6, PE-100 | 140 | .6577 | |
| 3 | HDPE PIPE, PN-6, PE-100 | 125 | .8696 | |
| 4 | HDPE PIPE, PN-6, PE-100 | 110 | 1.5473 | |
| 5 | HDPE PIPE, PN-6, PE-100 | 90 | 1.1646 | |
| 6 | HDPE PIPE, PN-6, PE-100 | 75 | 2.0483 | |
| 7 | HDPE PIPE, PN-6, PE-100 | 63 | 3.5392 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 579 |