| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097927 | Name of Scheme: KHASMAU & BRAMANPUR | No. of Villages: 3 | No. of Habitation Covered: 9 |
| Total Population Covered: 9040 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Sep-2023 | Actual Date of Completion (Capex): 25-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24.00 M / 136.0 m | KHASMAU & BRAHMANPUR | 25°.823603"N | 81.046186"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 780LPM / 60 M | KHASMAU & BRAHMANPUR | 25°.823603"N | 81.046186"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 275 KL / 18 M | KHASMAU & BRAHMANPUR | 25°.823603"N | 81.046186"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.t. K-9 | 100 | 0.03250 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.82223 | |
| 2 | HDPE | 180 | 1.89932 | |
| 3 | HDPE | 160 | 2.36534 | |
| 4 | HDPE | 125 | 0.65817 | |
| 5 | HDPE | 110 | 0.93318 | |
| 6 | HDPE | 90 | 2.43274 | |
| 7 | HDPE | 75 | 2.91362 | |
| 8 | HDPE | 63 | 14.95404 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1626 |