Project Completion Certificate (Ground Water)
Scheme ID: 20097999 Name of Scheme: tatia nibal wss No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1483 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 10-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.41/88.12 tatia nibal 27.405469 79.609083
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 350 LPM/59 M tatia nibal 27.405469 79.609083
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/12M tatia nibal 27.405469 79.609083
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 16
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.549
2 HDPE 63 2.620
3 HDPE 110 1.036
4 HDPE 140 0.122
HSC Connection
Sno. Total Nos.
1 268
Other Details
1.86
1.83
1.86
25-May-2025
26-May-2025