| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098002 | Name of Scheme: MAURSIDABAD SVS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 8796 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Jun-2027 | Actual Date of Completion (Capex): 19-Sep-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 28/130.47 | MAURSIDABAD | 27.55180 | 79.35143 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 750LPM/65M | MAURSIDABAD | 27.55180 | 79.35143 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275KL/18M | MAURSIDABAD | 27.55180 | 79.35143 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 250 | 0.556 | |
| 2 | HDPE PIPE | 90 | 3.792 | |
| 3 | HDPE PIPE | 63 | 7.946 | |
| 4 | HDPE PIPE | 110 | 1.439 | |
| 5 | HDPE PIPE | 125 | 0.350 | |
| 6 | HDPE PIPE | 140 | 0.654 | |
| 7 | HDPE PIPE | 160 | 0.562 | |
| 8 | HDPE PIPE | 180 | 0.326 | |
| 9 | HDPE PIPE | 200 | 0.719 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1190 |