Project Completion Certificate (Ground Water)
Scheme ID: 20098002 Name of Scheme: MAURSIDABAD SVS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 8796 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Jun-2027 Actual Date of Completion (Capex): 19-Sep-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28/130.47 MAURSIDABAD 27.55180 79.35143
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 750LPM/65M MAURSIDABAD 27.55180 79.35143
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275KL/18M MAURSIDABAD 27.55180 79.35143
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 250 0.556
2 HDPE PIPE 90 3.792
3 HDPE PIPE 63 7.946
4 HDPE PIPE 110 1.439
5 HDPE PIPE 125 0.350
6 HDPE PIPE 140 0.654
7 HDPE PIPE 160 0.562
8 HDPE PIPE 180 0.326
9 HDPE PIPE 200 0.719
HSC Connection
Sno. Total Nos.
1 1190
Other Details
4.83
4.72
4.45
19-Sep-2026
20-Sep-2026