Project Completion Certificate (Ground Water)
Scheme ID: 20098004 Name of Scheme: RAM PURA SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2010 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 08-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12 M /111.50 M RAM PURA 27.35127 79.60737
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 200 LPM / 61 M RAM PURA 27.35127 79.60737
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 KL / 14 M RAM PURA 27.35127 79.60737
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .02 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.28 COMPLETE
2 HDPE 63 2.664 COMPLETE
3 HDPE 110 1.259 COMPLETE
4 HDPE 125 .197 COMPLETE
5 HDPE 140 .997 COMPLETE
HSC Connection
Sno. Total Nos.
1 563
Other Details
2.52
2.47
2.49
08-May-2024
29-Jun-2024