| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098040 | Name of Scheme: Ramughat Water Supply System | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2630 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 21-Jan-2025 | Actual Date of Completion (Capex): 09-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.00/139.83 | Ramughat | 26.895845 | 83.293.598 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 33/43 | Ramughat | 26.895845 | 83.293.598 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 150/16 | Ramughat | 26.895836 | 83.293614 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.035 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.331 | Completed |
| 2 | HDPE | 75 | 1.874 | Completed |
| 3 | HDPE | 110 | 0.403 | Completed |
| 4 | HDPE | 140 | 0.398 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 455 |