Project Completion Certificate (Ground Water)
Scheme ID: 20098062 Name of Scheme: SHEKHPURA GP RO WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 11818 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 07-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.08 M / 119.07 M SHEKHPURA 29.27297 77.744989
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1000 LPM /55 M SHEKHPURA 29.27297 77.744989
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL / 16 MTR SHEKHPURA 29.27297 77.744989
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.36545
2 HDPE 75 0.76945
3 HDPE 90 2.79857
4 HDPE 110 1.46565
5 HDPE 125 0.74698
6 HDPE 140 0.10636
7 HDPE 160 1.19868
8 HDPE 180 0.07298
9 HDPE 200 0.14068
10 D.I 200 0.050
11 D.I 250 0.070
HSC Connection
Sno. Total Nos.
1 2205
Other Details
4.35
0.00
4.35
08-Jan-2025