Project Completion Certificate (Ground Water)
Scheme ID: 20098063 Name of Scheme: RATHUR GP RO WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1771 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 02-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.07 M / 111.98 M RATHUR 29.351304 77.810586
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 200 LPM / 51 M RATHUR 29.351304 77.810586
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50 KL / 18 M RATHUR 29.351304 77.810586
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.39756
2 HDPE 75 0.36574
3 HDPE 90 0.04098
4 HDPE 110 0.10255
5 HDPE 125 0.13465
6 HDPE 140 0.20165
HSC Connection
Sno. Total Nos.
1 385
Other Details
1.34
0.00
1.34
02-Mar-2025
03-Mar-2025