| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098064 | Name of Scheme: SHOROM GP RO WSS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 9276 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Sep-2022 | Actual Date of Completion (Capex): 02-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 83.69 M / 201.99 M | SHOROM | 29.333574 | 77.555751 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 2100 LPM / 56 MTR | SHOROM | 29.333574 | 77.555751 |
| 2 | SUBMERSIBLE | 2150 LPM / 56 MTR | SHOROM | 29.333574 | 77.555751 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 575 KL / 18 M | SHOROM | 29.333574 | 77.555751 |
| 2 | OHT-2 | 575 KL / 18 M | SHOROM | 29.333574 | 77.555751 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 200 | 0.06 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 250 | 0.52895 | |
| 2 | HDPE | 63 | 19.56969 | |
| 3 | HDPE | 75 | 1.96554 | |
| 4 | HDPE | 90 | 3.75565 | |
| 5 | HDPE | 110 | 2.18065 | |
| 6 | HDPE | 125 | 1.20832 | |
| 7 | HDPE | 140 | 0.8406 | |
| 8 | HDPE | 160 | 0.13845 | |
| 9 | HDPE | 180 | 0.89646 | |
| 10 | HDPE | 200 | 0.12135 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 2642 |