| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098066 | Name of Scheme: SHUKRATAL GP RO WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 24542 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Sep-2022 | Actual Date of Completion (Capex): 01-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 36.14/114.74 | SHUKRATAL KHADAR | 29.479413 | 77.975384 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 2100 M3/ 55 MTR | SHUKRATAL KHADAR | 29.479413 | 77.975384 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 200 | 0.04652 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.59376 | |
| 2 | HDPE | 75 | 0.9366 | |
| 3 | HDPE | 90 | 0.3909 | |
| 4 | HDPE | 110 | 3.96879 | |
| 5 | HDPE | 125 | 0.5201 | |
| 6 | HDPE | 140 | 0.17264 | |
| 7 | HDPE | 160 | 0.94266 | |
| 8 | HDPE | 180 | 1.9724 | |
| 9 | HDPE | 200 | 0.29652 | |
| 10 | DI | 300 | 1.87 | |
| 11 | DI | 250 | 0.192 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 918 |