Project Completion Certificate (Ground Water)
Scheme ID: 20098079 Name of Scheme: AMANULLAPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2415 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.2 Mtr / 94.28 Mtr AMANULLAPUR 29.01003 77.526603
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 LPM / 50 Mtr AMANULLAPUR 29.01003 77.526603
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 14 M AMANULLAPUR 29.01003 77.526603
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0272
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.033
2 HDPE 90 1.591
3 HDPE 110 0.542
4 HDPE 140 0430
5 HDPE 160 0.233
HSC Connection
Sno. Total Nos.
1 372
Other Details
2.11
2.11
1.69
24-Jan-2025
25-Jan-2025