Project Completion Certificate (Ground Water)
Scheme ID: 20098082 Name of Scheme: IKWARA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2319 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Jan-2025 Actual Date of Completion (Capex): 28-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.12 Mtr / 101.06 Mtr IKWARA 29.114585 77.993473
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200 LPM / 54 Mtr IKWARA 29.114585 77.993473
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 16 M IKWARA 29.114585 77.993473
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0326
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.189
2 HDPE 90 1.303
3 HDPE 110 0.740
4 HDPE 125 0.162
HSC Connection
Sno. Total Nos.
1 315
Other Details
1.90
1.90
1.49
15-Oct-2024
01-Nov-2024