| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098083 | Name of Scheme: DAHAR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4648 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Jan-2025 | Actual Date of Completion (Capex): 14-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 36.43 Mtr / 96.89 Mtr | DAHAR (RO) | 29.145836 | 77.534581 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 900 LPM / 54 Mtr | DAHAR (RO) | 29.145836 | 77.534581 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275 Kl / 16 M | DAHAR (RO) | 29.145836 | 77.534581 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0288 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.029 | |
| 2 | HDPE | 90 | 3.203 | |
| 3 | HDPE | 110 | 0.713 | |
| 4 | HDPE | 125 | 0.336 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 985 |