| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098085 | Name of Scheme: BAHADURPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3229 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 11-Jun-2025 | Actual Date of Completion (Capex): 15-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.41 Mtr / 90.12 Mtr | BAHADURPUR | 29.038248 | 77.93262 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 650 LPM / 50 Mtr | BAHADURPUR | 29.038248 | 77.93262 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 Kl / 14 M | BAHADURPUR | 29.038248 | 77.93262 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0186 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.003 | |
| 2 | HDPE | 90 | 1.577 | |
| 3 | HDPE | 110 | 0.515 | |
| 4 | HDPE | 125 | 0.479 | |
| 5 | HDPE | 140 | 0.625 | |
| 6 | 160 | 160 | 0.523 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 649 |