| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098109 | Name of Scheme: UPLEHRA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1990 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 23-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 22.21 Mtr / 103.12 Mtr | UPLEHRA | 28.916184 | 77.624634 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 200 LPM / 50 Mtr | UPLEHRA | 28.916184 | 77.624634 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 75 Kl / 14 M | UPLEHRA | 28.916184 | 77.624634 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0208 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.3076 | |
| 2 | HDPE | 90 | 1.1221 | |
| 3 | HDPE | 110 | 0.386 | |
| 4 | HDPE | 125 | 0.1433 | |
| 5 | HDPE | 140 | 0.564 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 384 |