Project Completion Certificate (Ground Water)
Scheme ID: 20098111 Name of Scheme: JATAULA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1332 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.55 Mtr / 101.64 Mtr JATAULA 29.054551 77.477169
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 56 Mtr JATAULA 29.054551 77.477169
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes JATAULA 29.054551 77.477169
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0052
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.197
2 HDPE 90 0.789
3 HDPE 110 0.396
4 HDPE 125 0.356
HSC Connection
Sno. Total Nos.
1 257
Other Details
1.20
1.20
0.98
14-Sep-2024
21-Apr-2025