Project Completion Certificate (Ground Water)
Scheme ID: 20098116 Name of Scheme: TATINA SAINI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2101 Base Year: 2019 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.18 Mtr / 98.07 Mtr TATINA SANI 28.912665 77.713199
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200 LPM / 55 Mtr TATINA SANI 28.912665 77.713199
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0052
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.618
2 HDPE 90 0.736
3 HDPE 110 0.455
4 HDPE 125 0.202
5 HDPE 140 0.301
HSC Connection
Sno. Total Nos.
1 451
Other Details
1.44
1.44
1.14
16-Nov-2024
01-Jan-2025