Project Completion Certificate (Ground Water)
Scheme ID: 20098124 Name of Scheme: MOHAMMADPUR HAYAK No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1894 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 27-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.07 Mtr / 96.95 Mtr MOHAMMADPUR HAYAK 29.118012 77.724564
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200 LPM / 50 Mtr MOHAMMADPUR HAYAK 29.118012 77.724564
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.649
2 HDPE 90 0.315
3 HDPE 110 0.376
HSC Connection
Sno. Total Nos.
1 246
Other Details
1.11
1.11
0.85
14-Oct-2024
15-Oct-2024