Project Completion Certificate (Ground Water)
Scheme ID: 20098128 Name of Scheme: SHAULANA (R.O) No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4704 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Jan-2025 Actual Date of Completion (Capex): 26-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 37.16 Mtr / 109.11 Mtr SAULANA 28.877409 77.666916
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM / 50 Mtr SAULANA 28.877409 77.666916
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 Kl / 14 M SAULANA 28.877409 77.666916
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0182
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.452
2 HDPE 75 0.889
3 HDPE 90 0.888
4 HDPE 110 0.137
5 HDPE 140 0.199
6 HDPE 160 0.0396
7 HDPE 180 0.111
8 HDPE 200 1.196
HSC Connection
Sno. Total Nos.
1 480
Other Details
3.00
3.00
2.28
14-Mar-2025
15-Mar-2025