Project Completion Certificate (Ground Water)
Scheme ID: 20098172 Name of Scheme: PAHARPUR-DUDHLI BANGAR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2459 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Jun-2025 Actual Date of Completion (Capex): 26-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.14 Mtr / 103.14 Mtr PAHARPUR - DUDHLI BANGAR 29.115425 77.844689
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 LPM / 56 Mtr PAHARPUR - DUDHLI BANGAR 29.115425 77.844689
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 Kl / 18 M PAHARPUR - DUDHLI BANGAR 29.115425 77.844689
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.037
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.060
2 HDPE 90 2.263
3 HDPE 110 0.624
4 HDPE 160 2.387
HSC Connection
Sno. Total Nos.
1 580
Other Details
2.91
2.91
2.40
15-Jul-2025
16-Jul-2025