Project Completion Certificate (Ground Water)
Scheme ID: 20098178 Name of Scheme: KHORRAI-DAYALPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2705 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Jun-2025 Actual Date of Completion (Capex): 16-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.16 Mtr / 100.99 Mtr KHORRAI - DAYALPUR 29.099145 78.004021
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50 Mtr KHORRAI - DAYALPUR 29.099145 78.004021
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 14 M KHORRAI - DAYALPUR 29.099145 78.004021
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0162
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.926
2 HDPE 90 0.721
3 HDPE 110 0.741
4 HDPE 125 0.403
5 HDPE 140 0.316
HSC Connection
Sno. Total Nos.
1 453
Other Details
2.53
2.53
2.04
07-Mar-2025
08-Mar-2025