Project Completion Certificate (Ground Water)
Scheme ID: 20098181 Name of Scheme: PATTI KHERKI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 642 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.1 Mtr / 107.26 Mtr PATTI KHERKI 29.071973 77.755761
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 100 LPM / 50 Mtr PATTI KHERKI 29.071973 77.755761
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes PATTI KHERKI 29.071973 77.755761
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0068
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 0.835
2 HDPE 90 0.510
3 HDPE 110 0.149
4 HDPE 125 0.158
HSC Connection
Sno. Total Nos.
1 161
Other Details
1.05
1.05
0.85
21-Aug-2024
02-Mar-2025