| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098206 | Name of Scheme: KHATAULI GRAMIN GP RO WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 18171 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Sep-2022 | Actual Date of Completion (Capex): 01-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 39.09 M / 113.03 M | KHATAULI GRAMIN | 29.280762 | 77.746218 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 1500 LPM / 55 M | KHATAULI GRAMIN | 29.280762 | 77.746218 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 200 | 0.0324 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 12.16865 | |
| 2 | HDPE | 75 | 2.57946 | |
| 3 | HDPE | 90 | 0.93457 | |
| 4 | HDPE | 110 | 1.27565 | |
| 5 | 125 | 125 | 0.69655 | |
| 6 | HDPE | 140 | 0.33079 | |
| 7 | HDPE | 160 | 1.59746 | |
| 8 | HDPE | 180 | 0.34056 | |
| 9 | HDPE | 200 | 1.90168 | |
| 10 | D.I | 300 | 0.87546 | |
| 11 | D.I | 250 | 0.60223 | |
| 12 | D.I | 200 | 0.33097 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 2970 |