Project Completion Certificate (Ground Water)
Scheme ID: 20098231 Name of Scheme: BHABHAURA Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 10
Total Population Covered: 4390 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Mar-2023 Actual Date of Completion (Capex): 21-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 36.17M/49.34 Bhaboura 26.383185 82.995131
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 17.5 HP Submersible Pump 920LPM/45M Bahbaura 26.383185 82.995131
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 275KL/14MTR Bhabaura 26.383185 82.995131
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.040 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.342
2 HDPE Pipe PN-6: Class PE-100 75 4.143
3 HDPE Pipe PN-6: Class PE-100 110 0.380
4 HDPE Pipe PN-6: Class PE-100 180 1.239
5 HDPE Pipe PN-6: Class PE-100 200 0.624
6 HDPE Pipe PN-6: Class PE-100 63 11.919
7 HDPE Pipe PN-6: Class PE-100 140 2.150
HSC Connection
Sno. Total Nos.
1 546
Other Details
3.33
3.33
3.33
15-May-2025
16-May-2025