Project Completion Certificate (Ground Water)
Scheme ID: 20098275 Name of Scheme: KAKARDHARA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2406 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 13-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.05/60.51 KAKARDHARA 26.95816 79.914898
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 550/60 KAKARDHARA 26.95816 79.914898
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/18 KAKARDHARA 26.95816 79.914898
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 RISING MAINS
2 DI 100 0.0274 RISING MAINS
3 DI 200 0.0061 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.117 DISTRIBUTION
2 HDPE 63 2.136 DISTRIBUTION
3 HDPE 110 0.347 DISTRIBUTION
4 HDPE 140 2.21 DISTRIBUTION
5 HDPE 160 1.239 DISTRIBUTION
6 HDPE 180 0.320 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 548
Other Details
3.05
3.03
3.05
16-Jul-2024
17-Jul-2024