Project Completion Certificate (Ground Water)
Scheme ID: 20098277 Name of Scheme: GADANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 2568 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 23-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/77.30 GADANPUR 79.72557949 27.11098377
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 550 LPM/66 M GADANPUR 79.72557949 27.11098377
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 M GADANPUR 79.72557949 27.11098377
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0092 Rising main
2 DI 150 0.0161 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.94 Distribution
2 HDPE 63 5.25 Distribution
3 HDPE 110 1.80 Distribution
4 HDPE 140 0.73 Distribution
5 HDPE 160 0.021 Distribution
HSC Connection
Sno. Total Nos.
Other Details
2.69
2.69
2.69
23-Apr-2025
24-Apr-2025