Project Completion Certificate (Ground Water)
Scheme ID: 20098321 Name of Scheme: PURE MIHIB SHAH Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3000 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Jul-2024 Actual Date of Completion (Capex): 05-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.02 M / 53.73 M PURE MIHIB SHAH 28.935158 77.916346
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 650 M / 52 M PURE MIHIB SHAH 28.935158 77.916346
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 14 M PURE MIHIB SHAH 28.935158 77.916346
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.785
2 HDPE 90 1.099
3 HDPE 110 1.140
4 HDPE 140 1.963
5 HDPE 160 0.024
6 HDPE 180 0.532
HSC Connection
Sno. Total Nos.
1 580
Other Details
3.63
0.00
3.52
05-Sep-2024
06-Dec-2024