Scheme ID: 20098333 Name of Scheme: TENWASI Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 1731 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Apr-2024 Actual Date of Completion (Capex): 27-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 32 M / 56.83 M TENWASI 26.601415 81.635659
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 52 M TENWASI 26.601415 81.635659
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 KL / 14 M TENWASI 26.601415 81.635659
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0370
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.201
2 HDPE 90 1.646
3 HDPE 110 0.765
4 HDPE 140 0.699
5 HDPE 160 0.243
HSC Connection
Sno. Total Nos.
1 290
Other Details
1.97
0.00
1.94
27-Mar-2025