Project Completion Certificate (Ground Water)
Scheme ID: 20098342 Name of Scheme: BANDOIYA Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1498 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Jul-2024 Actual Date of Completion (Capex): 26-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.05 M/ 60.8 M BANDOIYA 28.909112 77.901689
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM/ 50 M BANDOIYA 28.909112 77.901689
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL/ 12 M BANDOIYA 28.909112 77.901689
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.431
2 HDPE 90 1.296
3 HDPE 110 0.594
4 HDPE 140 0.287
5 HDPE 160 0.290
6 HDPE 180 0.685
HSC Connection
Sno. Total Nos.
1 277
Other Details
1.85
0.00
1.84
26-Sep-2024
27-Dec-2024