Project Completion Certificate (Ground Water)
Scheme ID: 20098346 Name of Scheme: Tikariya Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 13
Total Population Covered: 2451 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-May-2023 Actual Date of Completion (Capex): 16-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15.05 M / 80.55 Tikariya 26.19141 81.72415
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550 LPM / 56 M Tikariya 26.19141 81.72415
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 18 M Tikariya 26.19141 81.72415
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0250
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.783
2 HDPE 90 2.765
3 HDPE 110 0.617
4 HDPE 140 2.178
5 HDPE 160 0.024
HSC Connection
Sno. Total Nos.
1 531
Other Details
3.13
0.00
3.09
16-Mar-2025
17-Jun-2025