| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098368 | Name of Scheme: Kabdaut & Butrari Water Supply Scheme Reorganisation | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 6529 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Jun-2024 | Actual Date of Completion (Capex): 19-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 mm | 300 mtr plain pipe | oht campus | 29.402834 | 77.348202 |
| 2 | 200 mm | 137.17 mtr slotted pipe | oht campus | 29.402834 | 77.348202 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 hp | 450 LPM/ 55mtr | oht campus | 29.402834 | 77.348202 |
| 2 | 12.5 hp | 450 LPM/ 55mtr | oht campus | 29.402834 | 77.348202 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ( existing oht | 100 kl/ 14 mtr | oht campus | 29.402834 | 77.348202 |
| 2 | new concrete oht | 200 kl/ 14 mtr | new oht campus | 29.402834 | 77.348202 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | di k7 | 125 | 0.003 | new oht |
| 2 | di k7 | 100 | 0.016 | old oht |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | hdpe | 90 | 1.2442 | |
| 2 | HDPE | 75 | 0.5269 | |
| 3 | HDPE | 63 | 8.8626 | |
| 4 | HDPE | 110 | 0.628 | |
| 5 | HDPE | 140 | 0.6854 | |
| 6 | HDPE | 160 | 0.3951 | |
| 7 | HDPE | 180 | 0.1761 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1485 |