Project Completion Certificate (Ground Water)
Scheme ID: 20098445 Name of Scheme: Agethua Gram Panchayat Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1460 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Jun-2024 Actual Date of Completion (Capex): 12-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/98.30 AGETHUA 26.707023 81.941793
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 303LPM/40Mtr AGETHUA 26.707023 81.941793
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 AGETHUA 26.707164 81.941624
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 80 0.0273
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.0000
3 HDPE Pipe PN-6: Class PE-100 160 0.0000
4 HDPE Pipe PN-6: Class PE-100 140 0.0620
5 HDPE Pipe PN-6: Class PE-100 125 0.1177
6 HDPE Pipe PN-6: Class PE-100 110 0.6334
7 HDPE Pipe PN-6: Class PE-100 90 0.2282
8 HDPE Pipe PN-6: Class PE-100 75 0.9589
9 HDPE Pipe PN-6: Class PE-100 63 3.1805
HSC Connection
Sno. Total Nos.
Other Details
1.45
0.00
1.75
12-Jun-2024
01-Feb-2025