Project Completion Certificate (Ground Water)
Scheme ID: 20098532 Name of Scheme: SHODUTT-SHIVPURI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 10245 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Jan-2025 Actual Date of Completion (Capex): 24-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.06 Mtr / 125.98 Mtr SHODUTT - SHIVPURI 28.943455 77.975181
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 2150 LPM / 56 Mtr SHODUTT - SHIVPURI 28.943455 77.975181
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 625 Kl / 18 M SHODUTT - SHIVPURI 28.943455 77.975181
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0217
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.107
2 HDPE 90 3.699
3 HDPE 110 1.489
4 HDPE 125 0.515
5 HDPE 140 0.715
6 HDPE 160 0.301
7 HDPE 180 0.314
8 HDPE 200 0.446
9 DI 250 1.407
HSC Connection
Sno. Total Nos.
1 1305
Other Details
7.00
7.00
5.65
12-Jul-2024
10-Oct-2024