Project Completion Certificate (Ground Water)
Scheme ID: 20098744 Name of Scheme: KARAILA SAHBAJPUR RF PWS No. of Villages: 2 No. of Habitation Covered: 15
Total Population Covered: 5290 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 28-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Existing KARAILA SAHBAJPUR 27.310874 81.600537
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 60/40 KARAILA SAHBAJPUR 27.310874 81.600537
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/18 KARAILA SAHBAJPUR 27.310857 81.600598
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 150 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 2.246
HSC Connection
Sno. Total Nos.
1 261
Other Details
0.97
0.89
0.77
12-Oct-2023
29-Aug-2025