| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098943 | Name of Scheme: TARANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1360 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Sep-2024 | Actual Date of Completion (Capex): 01-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Depth of Plain Pipe (m) | 79 | TW | 25.156988 | 83.364879 |
| 2 | Depth of Strainer (m) | 15 | TW | 25.156988 | 83.364879 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 300/45 | TW | 25.156988 | 83.364879 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc tank | 100/12 | OHT | 25.156988 | 83.364879 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.48 | |
| 2 | HDPE | 75 | 0.58 | |
| 3 | HDPE | 110 | 0.26 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 312 |