Scheme ID: 20098984 Name of Scheme: FATEHPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 597 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 06-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 Mtr / 83.7 Mtr FATEHPUR-DURJANPUR 29.081132 77.560455
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 50 LPM / 56 Mtr FATEHPUR-DURJANPUR 29.081132 77.560455
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes FATEHPUR-DURJANPUR 29.081132 77.560455
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0048
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.725
2 HDPE 90 0.477
3 HDPE 110 0.117
HSC Connection
Sno. Total Nos.
1 134
Other Details
1.02
1.02
0.79
24-Sep-2024
17-Feb-2025