| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098998 | Name of Scheme: BARGADHA CHILBILA NAWABGANJ (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2839 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Oct-2024 | Actual Date of Completion (Capex): 12-May-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 30/201.76 | BARGADHA CHILBILA | 27.960999 | 81.541499 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 36M^3/45MTR | BARGADHA CHILBILA | 27.960999 | 81.541499 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK(RCC) | 175KL/12M | BARGADHA CHILBILA | 27.961034 | 81.541504 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K9/DI | 125 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5400 | |
| 2 | HDPE | 75 | 351.3 | |
| 3 | HDPE | 90 | 223.7 | |
| 4 | HDPE | 110 | 220.8 | |
| 5 | HDPE | 125 | 1004 | |
| 6 | HDPE | 160 | 72 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 302 |