Project Completion Certificate (Ground Water)
Scheme ID: 20099008 Name of Scheme: SHIVPUR BAIRAGI VISHESWARGANJ (VPL) PWS No. of Villages: 1 No. of Habitation Covered: 19
Total Population Covered: 4500 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Dec-2024 Actual Date of Completion (Capex): 06-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36/159.3 Shivpur Bairagi 27.325344 81.766405
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 1cum/min, 45m head Shivpur Bairagi 27.325344 81.766405
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 300KL,16M Shivpur Bairagi 27.325344 81.766405
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 125 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PE-100-PN6 63 12.898
2 HDPE-PE100-PN6 75 0.556
3 HDPE-PE100-PN6 90 2.195
4 HDPE-PE100-PN6 110 0.664
5 HDPE-PE100-PN6 160 1.292
6 HDPE-PE100-PN6 200 0.789
HSC Connection
Sno. Total Nos.
1 458
Other Details
3.67
3.67
2.60
27-Aug-2026
08-Sep-2026