Project Completion Certificate (Ground Water)
Scheme ID: 20099014 Name of Scheme: BANWARI GOPALPUR CHITAURA (VPL) MVS PWS No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 3700 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Oct-2023 Actual Date of Completion (Capex): 31-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30/243.8 Banwari Gopalpur 27.614723 81.592303
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 0.85cum/min, 45m Banwari Gopalpur 27.614723 81.592303
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over head Tank 250kl,16m Banwari Gopalpur 27.614723 81.592303
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K9/DI 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN6/HDPE 63 8.62
2 PN6/HDPE 75 0.62
3 PN6/HDPE 90 0.341
4 PN6/HDPE 110 0.428
5 PN6/HDPE 160 1.010
6 PN6/HDPE 200 0.784
HSC Connection
Sno. Total Nos.
1 600
Other Details
2.77
2.77
2.66
30-Apr-2026
01-May-2026