| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099015 | Name of Scheme: SALARPUR CHITAURA (VPL) MVS PWS | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 5300 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Oct-2024 | Actual Date of Completion (Capex): 12-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 30.2m/ 258m | Salarpur | 27.617961 | 81.627827 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 1200LPM /45m | Salarpur | 27.617961 | 81.627827 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank | 350kl,16m | Salarpur | 27.617961 | 81.627827 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K9 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PN6 | 63 | 8.853 | |
| 2 | HDPE/PN6 | 75 | 899.9 | |
| 3 | HDPE/PN6 | 90 | 1.666 | |
| 4 | HDPE/PN6 | 110 | 1.492 | |
| 5 | HDPE/PN6 | 160 | 1.653 | |
| 6 | HDPE/PN6 | 200 | 0.360 | |
| 7 | DI/K7 | 250 | 0.034 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 780 |