Project Completion Certificate (Ground Water)
Scheme ID: 20099020 Name of Scheme: ARGORWA (Bhak) MIHIPURWA (VPL) MVS PWS No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 8383 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Oct-2024 Actual Date of Completion (Capex): 31-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 30/188.76 Argorwa 28.004098 81.457224
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-pump 42.6/45 Argorwa 28.004098 81.457224
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZnAl Tank 250/18 Argorwa 28.004098 81.457224
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K-7 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.662
2 HDPE 75 1.102
3 HDPE 90 0.915
4 HDPE 110 5.352
5 HDPE 125 0.298
6 HDPE 140 0.269
7 HDPE 180 0.321
8 HDPE 160 0.119
9 HDPE 200 1.203
HSC Connection
Sno. Total Nos.
1 1378
Other Details
3.10
3.10
3.20
21-May-2026
21-Jun-2026