Project Completion Certificate (Ground Water)
Scheme ID: 20099140 Name of Scheme: HUSAINPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2467 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Dec-2024 Actual Date of Completion (Capex): 10-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 41.80 HUSAINPUR 26.58519 81.551141
2 200MM PLAIN PIPE 55.00 HUSAINPUR 26.58519 81.551141
3 150MM SLOTTED PIPE 16.00 HUSAINPUR 26.58519 81.551141
4 200MM SLOTTED PIPE 15.00 HUSAINPUR 26.58519 81.551141
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 550 LPM / 54 M HUSAINPUR 26.58519 81.551141
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL/ 16 M HUSAINPUR 26.58519 81.551141
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 10.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.284
2 HDPE PIPE 75 0.183
3 HDPE PIPE 63 9.019
4 HDPE PIPE 110 0.673
5 HDPE PIPE 125 0.502
6 HDPE PIPE 140 0.055
7 HDPE PIPE 160 0.173
HSC Connection
Sno. Total Nos.
1 585
Other Details
3.03
0.00
3.01
10-Jun-2024
24-Dec-2024