Project Completion Certificate (Ground Water)
Scheme ID: 20099160 Name of Scheme: Purwa fakire No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1908 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 21-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.05 M / 171.74 M PURWA FAKIRE 26.678495 79.575165
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 49 M PURWA FAKIRE 26.678495 79.575165
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL / 12 M PURWA FAKIRE 26.678495 79.575165
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0125
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.752
2 HDPE 90 0.723
3 HDPE 110 0.138
4 HDPE 125 0.322
5 HDPE 140 0.516
HSC Connection
Sno. Total Nos.
1 465
Other Details
1.73
0.00
1.75
20-Apr-2025
22-Apr-2025