Project Completion Certificate (Ground Water)
Scheme ID: 20099164 Name of Scheme: Barau PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1448 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Jun-2024 Actual Date of Completion (Capex): 06-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.04m/111.31m Barau 26.724637 79.619747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 350LPM/51M Barau 26.724637 79.619747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100KL/14M Barau 26.724637 79.619747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.013
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.18
2 HDPE 90 1.978
3 HDPE 110 0.241
4 HDPE 125 0.272
HSC Connection
Sno. Total Nos.
1 340
Other Details
1.48
0.00
1.48
19-Feb-2024
07-Apr-2024