Project Completion Certificate (Ground Water)
Scheme ID: 20099230 Name of Scheme: GULHARIYA GAZIPUR KAISARGANJ RF PWS No. of Villages: 1 No. of Habitation Covered: 29
Total Population Covered: 7540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 05-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Existing GULHARIYA GAZIPUR 27.364594 81.611029
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 72/40 GULHARIYA GAZIPUR 27.364594 81.611029
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/18 GULHARIYA GAZIPUR 27.364736 81.61119
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Rising Main/DI-K7 150 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 2.725
2 HDPE Pipe PN-6; Class PE-100 75 0.245
HSC Connection
Sno. Total Nos.
1 422
Other Details
0.99
0.96
0.95
05-Nov-2025
06-Nov-2025