Project Completion Certificate (Ground Water)
Scheme ID: 20099234 Name of Scheme: SINGARO PHAKARPUR RF PWS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2400 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 04-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Existing SINGRO 27.428315 81.621277
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 36/36 SINGRO 27.428315 81.621277
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 SINGRO 27.428138 81.62106
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 100 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 0.926
2 HDPE Pipe PN-6; Class PE-100 75 0.056
3 HDPE Pipe PN-6; Class PE-100 110 0.628
4 HDPE Pipe PN-6; Class PE-100 140 0.318
HSC Connection
Sno. Total Nos.
1 202
Other Details
0.72
0.59
0.58
04-Oct-2025
05-Oct-2025