| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099238 | Name of Scheme: BIRAHIMDIHA TEJWAPUR RF PWS | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 2370 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2025 | Actual Date of Completion (Capex): 13-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | Existing | BIRAHIM DEEHA | 27.486905 | 81.523228 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 30/40 | BIRAHIM DEEHA | 27.486905 | 81.523228 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | BIRAHIM DEEHA | 27.466822 | 81.523281 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | RISING MAIN/DI-K7 | 150 | 0.029 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6; Class PE-100 | 63 | 1.858 | |
| 2 | HDPE Pipe PN-6; Class PE-100 | 75 | 0.891 | |
| 3 | HDPE Pipe PN-6; Class PE-100 | 140 | 0.174 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 188 |